Library Table of Contents Index Previous Page (Alt-p) Next Page (Alt-n) Comments

Required tools and equipment

Required tools and equipment  Top

Prior to receiving your hardware, make sure that you have the appropriate tools and equipment assembled and ready to use:

Attention
If the DB-9 to DB-9 straight-through serial cable for an ASCII terminal connection provided with your system is not compatible with your terminal connector, you need a null modem cable.

WARNING
Three people are required to install FAS900 series appliances, GF900 series gateways, C6200 NetCache appliances, FAS6000 series appliances, and NearStore R150 and R200 storage engines when both power supplies are installed. Two people are required to install all other storage appliances and disk shelves safely into a rack or System Cabinet.

Additional tools necessary for -48V DC power connections  Top

If you ordered a -48V DC version of your appliance, you need the following
-48V DC power supply cable tools and equipment to fabricate the three-way cables required for DC power connections:

Library Table of Contents Index Previous Page (Alt-p) Next Page (Alt-n) Comments