You need the following tools and manuals to prepare your system cabinets or equipment racks for clustering:
When you received your system cabinets or nodes and disk shelves for installation in equipment racks, you should have received the following cables:
Note
If your cluster will be farther apart than 30 meters, you must use a SC-SC Duplex 50/125 plenum cable to connect them.
For details about the cabling process, see the following topics:
Copyright © 1994-2003, Network Appliance, Inc. All rights
reserved.
Part No. 210-00375
File: ch1new5.htm
Last updated: 01/16/03 13:25:37