To cable the new disk shelf to the existing Channel A and B loops, complete the following steps.
| 1 | Cable the last disk shelf Channel A LRC Output port to the new disk shelf Channel A LRC Input port. Label the cable with a solid-colored label. |
| 2 | Cable the last disk shelf Channel B LRC Output port to the new disk shelf Channel B LRC Input port. Label the cable with a striped label. |
| 3 | Set the Channel A terminate switch on the new disk shelf to On, then set the Channel B terminate switch to On. |
| 4 | Set the Channel A terminate switch on the previous disk shelf to Off, then set the Channel B terminate switch to Off. |
| 5 | Go to Step 3: Updating the firmware and checking the new disk shelf. |