To cable the Channel A loops, complete the following steps, using the diagram for reference.
Step
|
Action
|
|
1 |
Cable the FC-AL in Slot 8, Port 0 to the disk shelf 1 LRC Input port of disk pool 1, then cable the FC-AL in Slot 6, Port 0 to the disk shelf 1 LRC Input port of disk pool 0.
|
|
2 |
Cable the disk shelf 1 Channel A LRC Output port to the disk shelf 2 Channel A LRC Input port for both disk pools. Label these cables with solid-colored labels.
|
|
3 |
Repeat Step 2 connecting output to input, for the remaining disk shelves in the loop.
|
|
4 |
Set the terminate switches to Off on all but the last disk shelf in the loop, then set the terminate switch on the last disk shelf to On.
|
|
5 |
Repeat Steps 1 through 4 for the partner node.
|
|
6 |
Go to Step 2: Cabling the nodes together.
|