Library Table of Contents Index Previous Next Comments

Connecting the system to a power source

Powering on all units in the system  Top

You power on the units in your system in this sequence:

The disk shelves and disk drives require time to power on, reset, and prepare to respond to the filer. The filer expects these units to be ready for input/output when it powers on and performs its reset and self-test.

The power-on process for a new installation automatically

Powering on the disk shelves  Top

To power on the disk shelves, see your Fibre Channel StorageShelf guide.

Connecting the filer to power  Top

For instructions about connecting your F800 series filer to power, go to one of the following sections:

Library Table of Contents Index Previous Next Comments