Chapter 1

Preparing for Installation

About this chapter  Top

This chapter specifies the preparation requirements for the first-time installation of an F85 NetApp® filer system as either a freestanding tower or as a system in a 19-inch, square-hole four-post equipment rack.

The preparation requirements include tabulated descriptions of site requirements, lists of required tools and equipment, and an installation plan for the filer system. This guide also provides a list of the hardware and equipment you need to configure your filer.

Topics in this chapter  Top

This chapter discusses the following topics: