Required tools, equipment, and documentation
Equipment you receive with your appliance
In addition to this guide, your shipment should have the following components:
- An FAS900 series appliance and bezel
- A DB-9 to DB-9 straight-through serial cable and a DB-9 to RJ-45 adapter for your ASCII terminal connection, if ordered
- A disposable antistatic grounding leash
- The appropriate rack installation kit
- FAS900 series documentation
Equipment rack installation components
The following table lists the components you receive to install your appliance in a specific type of equipment rack.
Tools or equipment
|
Front-mounted on a two-post equipment rack
|
Center-mounted on a two-post equipment rack
|
Front-mounted on a four-post equipment rack
|
Four-post rack adjustable supports
|
|
|
X
|
Rail mounting screws
|
X
|
X
|
X
|
Two-post rack mounts
|
X
|
X
|
|
Required tools
To install your appliance components in an equipment rack, you need the following tools and equipment:
Required configuration equipment
To configure your system, you need the following equipment on site:
- ASCII terminal (also referred to as an ANSI terminal)
- Serial console
Required documentation
The following table lists additional documentation you need to help manage your FAS900 series appliance.
Document name
|
When to use
|
Site Requirements Guide
|
Use this guide to assist you in preparing your site for your FAS900 series appliance.
|
Data ONTAP Release Notes
|
Use this document to see what is new with your appliance, for a list of new procedures that didn't make the user documentation, and for a listing of the changes since the last release of the Data ONTAPTM software.
|
System Configuration Guide
|
Use this guide to configure and optimize your appliance.
|
Routine Administration Guide
|
Use this guide to administer, manage, and optimize your appliance.
|
Copyright © 1994-2003, Network Appliance, Inc. All rights
reserved.
Part No. 210-00412
File: sitepre2.htm
Last updated: 01/22/03 12:14:17