The disaster recovery procedure is an extreme measure that should be used only if the failure disrupts all communication from one MetroCluster site to the other for a prolonged period of time.
The following are examples of disasters that could cause such a failure:
It is critical that you follow some predefined methodical procedure to confirm that a disaster really occurred. The procedure should include determining the status of the supposed disaster site by
You should declare a disaster only after verifying that a disaster occurred and that service cannot be restored.
If the failure is one in which the cluster relationship is reestablished after fixing the problem, you do not want to perform the disaster recovery procedure.
Do not perform the disaster recovery procedure for the following failures:
With this type of failure, both nodes of the cluster remain running. Automatic takeover is disabled because Data ONTAP cannot synchronize the nonvolatile RAM (NVRAM) logs. After you fix the problem and reestablish the connection, the cluster nodes resynchronize their NVRAM logs and the cluster returns to normal operation.
With this type of failure, you see a "mailbox disk invalid" message on the console of the filer that cannot see the storage. After you fix the problem and reestablish the connection, the cluster returns to normal operation.
With this type of failure, both nodes of the cluster remain running. You see a "mailbox disk invalid" message because a filer at one site cannot see the storage at the other site. You also see a message because the two filers cannot communicate with each other. After you fix the problem and reestablish the connection, the cluster nodes resynchronize their NVRAM logs and the cluster returns to normal operation.
Copyright © 1994-2003, Network Appliance, Inc. All rights
reserved.
Part No. 210-00325
File: appendi5.htm
Last updated: 01/14/03 17:51:57