To cable the Channel B loops, complete the following steps, using the diagram for reference.
| 1 | Cable the FC-AL adapter in Slot 8, Port 1 of the local node, to the local node disk shelf 1 LRC/ESH Input port of disk pool 1, then cable the FC-AL adapter in Slot 6, Port 1 of the local node to the partner node disk shelf LRC/ESH Input port of the first disk shelf in disk pool 0. |
| 2 | Cable the local node's disk shelf 1 Channel B LRC/ESH Output port to the local node's disk shelf 2 Channel B LRC/ESH Input port and repeat for the remaining disk shelves in the loop in both disk pools. Label these cables with a striped labels. |
| 3 | Cable the FC-AL adapter in Slot 6, Port 1 of the partner node to the local node disk shelf LRC/ESH Input port of the first disk shelf of disk pool 0, then cable the FC-AL adapter in Slot 8, port 1 of the partner node to the partner node disk shelf 1 LRC/ESH Import of disk pool 1, then cable the remaining disk shelves for the node. |
| 4 | Set the terminate switches to Off on all but the last disk shelf in the loop, then set the terminate switch on the last disk shelf to On. |
| 5 | |
| 6 | Go to Step 4: Completing setup and testing your mirrored cluster. |
Copyright © 1994-2003, Network Appliance, Inc. All rights
reserved.
Part No. 210-00341
File: ch6mrr12.htm
Last updated: 05/01/03 17:39:39