Preparing your equipment
Where to install a cluster
You can install a cluster in one or more system cabinets or in equipment racks. Install the equipment as described in the appropriate section:
Preparing the system cabinets
To prepare your system cabinets for clustering, complete the following steps.
Step
|
Action
|
|
1
|
Install the system cabinet or cabinets, as described in the 42U System Cabinet Guide.
|
|
2
|
If you have a cluster in...
|
Then...
|
|
A single system cabinet
|
- Connect the nodes to the network.
- Connect the system cabinet to an
appropriate power source.
- Apply power to the system cabinet and
configure the cluster, as described in
Chapter 4, Configuring the Cluster.
|
|
Multiple system cabinets
|
- Remove the front and rear doors and any
side panels that need to be removed to
connect the system cabinets together.
- Connect the system cabinets together, as
described in the 42U System Cabinet Guide.
- Connect the nodes to the network.
|
Preparing the equipment racks
To prepare your nodes for clustering in equipment racks, complete the following steps.
Step
|
Action
|
|
1
|
Install the nodes in the equipment racks, as described in the Fibre Channel disk shelf guide, hardware guide, or Quick Start guide that came with your equipment.
|
|
2
|
Install the disk shelves in the equipment rack, as described in the appropriate Fibre Channel disk shelf guide.
|
|
3
|
Label the dual-port FC-AL interfaces, where appropriate.
|
|
4
|
Connect the nodes to the network, as described in the FAS900 Series Hardware and Service Guide or the F800 Series Hardware Guide.
|