The procedure for cabling the Channel B loops for a standard cluster and mirrored cluster are different. Follow the directions in the appropriate section:
To cable the Channel B loops in a standard cluster, complete the following steps, using the diagram for reference.
| 1 |
Cable the dual-port FC-AL adapter in slot 2, Bottom port of the local node, to the partner node disk shelf 1 Channel B LRC, ESH, or ESH2 Input port. |
| 2 |
Cable the local node's disk shelf 1 Channel B LRC, ESH, or ESH2 Output port to the local node's disk shelf 2 Channel B LRC, ESH, or ESH2 Input port. Label this cable with a striped label. |
| 3 |
Repeat Step 2 for the remaining disk shelves in the disk pool. |
| 4 |
Set the terminate switches to Off on all but the last disk shelf in the pool, then set the terminate switch on the last disk shelf to On. Note |
| 5 | |
| 6 |
Go to Cabling the cluster adapters. |
To cable the Channel B loops in a mirrored cluster, complete the following steps, using the diagram for reference.
| 1 |
Cable the dual-port FC-AL adapter in slot 8, Bottom port of the local node to the partner node disk shelf 1 Channel B LRC, ESH, or ESH2 Input port of disk pool 1, then cable the dual-port FC-AL adapter in slot 5, Bottom port of the local node to the partner node disk shelf 1 Channel B LRC, ESH, or ESH2 Input port of disk pool 0. |
| 2 |
Cable the local node's disk shelf 1 Channel B LRC, ESH, or ESH2 Output port to the local node's disk shelf 2 Channel B LRC, ESH, or ESH2 Input port of disk pool 1. Label this cable with a striped label. |
| 3 |
Repeat Step 2 connecting Channel B output to input, for any remaining disk shelves in the disk pool. Note |
| 4 |
Set the terminate switches to Off on all but the last disk shelf in the loop, then set the terminate switch on the last disk shelf to On. Note |
| 5 | |
| 6 |
Go to Cabling the cluster adapters. |
Copyright © 1994-2004, Network Appliance, Inc. All rights
reserved.
Part No. 210-00651
File: ch2_new6.htm