Library Table of Contents Index Previous Next Comments

Installing an FAS250 in a rack

Installing an FAS250  Top

To install the appliance in a rack, complete the following steps.

WARNING
You must install the FAS250 with either the two-post telco tray kit, the center-of-gravity bracket kit, or the four-post rail kit that came in your shipment package. Do not flush-mount the appliance using only the front ear-mounts; the appliance will collapse from the rack under its own weight.

Step

Action

1

Put on the antistatic wrist strap and grounding leash.

2

Select two holes on each side of the rack for the installation, making sure that the holes on the opposite sides of the rack are aligned with each other horizontally.

3

 

 

If you are using the...

Then...

Two-post telco tray kit

  1. Align the left post screw holes on the two-post rack with the screw holes on the left half of the telco tray, then secure it to the post with four screws.
  2. Align the right half of the telco tray with the left half and repeat Step 1 above to secure it to the post.
  3. Install the appliance onto the telco tray kit and retain it with the mounting screws to secure the appliance mounting flanges to the telco-type rack.
  4. Conceal the mounting screws with the provided bezel mounting screw covers.

The following illustration shows the two-post telco tray kit being installed.

The following illustration shows an FAS250 being installed in a two-post telco tray kit.

Center-of-gravity bracket kit

  1. Install the two-post telco trays to the rack only, as shown in the previous procedure. Do not install the appliance yet.
  2. Attach the center-of-gravity brackets to each side of your appliance with the supplied screws, as shown in the following illustration.
  3. With the center-of-gravity brackets installed, slide the appliance onto the two-post telco trays and secure the center-of-gravity brackets to the rack using screws from the supplied hardware kit.

The following illustration shows an FAS250 installed in a rack using a center-of-gravity bracket.

Four-post rail kit

For Step 1 through Step 5 below, see the illustration that follows.

  1. Connect the left support with the left rail, using three M5 nuts, three lock washers, and three M5 x 10 screws. Leave them loose enough so that you can adjust the length of the rail.
  2. Align the holes in the front of the assembled rail with the front post of the four-post rack, and secure it to the post with two location pins and washers.
  3. Attach the rear of the assembled rail to the rear post using two M5 x 10 screws, washers, and lock washers, then tighten the rail and support.
  4. Repeat Step 1 through Step 3 for the right support rail.
  5. Install the clip nuts for the appliance into the equipment rack posts. The bottom-most clip nut should be directly above the bottom locator pin and the top clip nut should be six holes above the bottom clip nut.
  6. Install the appliance onto the rack mount kit and retain it with the mounting screws to secure the appliance mounting flanges to the front posts of the rack.
  7. Conceal the mounting screws with the provided bezel mounting screw covers.

The following illustration shows how to install a four-post rail kit.

4

Go to Connecting an FAS250.

Library Table of Contents Index Previous Next Comments