To cable the new disk shelf to the existing Channel A and B loops, complete the following steps.
| 1 | Cable the last disk shelf Channel A LRC/ESH Output port to the new disk shelf Channel A LRC/ESH input port. Label the cable with a solid-colored label. |
| 2 | Cable the last disk shelf Channel B LRC/ESH Output port to the new disk shelf Channel B LRC/ESH Input port. Label this cable with a striped label. |
| 3 | |
| 4 | Set both terminate switches on the previous disk shelf to Off. |
| 5 | Reenable negotiated failover in your cluster by entering the following command from the node console: cf nfo enable disk_shelf |
| 6 | Go to Testing the LRC/ESH modules. |
Copyright © 1994-2003, Network Appliance, Inc. All rights
reserved.
Part No. 210-00341
File: ch4dsk6.htm
Last updated: 05/01/03 17:39:36