This chapter specifies the preparation requirements for the first-time installation of an F85 NetApp® filer system as either a freestanding tower or as a system in a 19-inch, square-hole four-post equipment rack.
The preparation requirements include tabulated descriptions of site requirements, lists of required tools and equipment, and an installation plan for the filer system. This guide also provides a list of the hardware and equipment you need to configure your filer.
This chapter discusses the following topics:
Copyright © 1994-2002, Network Appliance, Inc. All rights
reserved.
Part No. 210-00390
File: chapter1.htm
Last updated: 12/13/02 13:16:54