You power on the components in your system in this sequence:
Caution
You must power on the storage engine after the disk shelves.
The disk shelves and disk drives require time to power on, reset, and prepare to respond to the storage engine. The storage engine expects these units to be ready for input/output when it powers on and performs its reset and self-test.
The power-on process for a new installation automatically
For details about connecting the system to a power source and powering on, see the following topics:
Copyright © 1994-2003, Network Appliance, Inc. All rights
reserved.
Part No. 210-00387
File: ch2_co11.htm
Last updated: 10/09/03 17:31:16