The following table shows the maximum number of LUNs on the storage subsystem that the gFiler can support and the minimum number of LUNs that the gFiler requires.
|
The GF270c requires a total of four LUNs. Each CPU module (head) of the GF270c requires a minimum of two LUNs: | ||
The gateway has restrictions on the maximum and minimum size LUN supported.
The maximum LUN size the gFiler supports is 500 GB.
The minimum LUN size that the gFiler supports is 1 GB.