Library Table of Contents Index Previous Page (Alt-p) Next Page (Alt-n) Comments

Switch-attached cluster configuration--257 to 512 LUNs

Connectivity overview  Top

The following information is for a switch-attached cluster configuration of 257 to 512 LUNs. The illustration and table show the number of ports and cable connections required for storage subsystems that support 256 LUNs per port or 256 LUNs per host group per port (see Storage subsystem port support, by model).

Ports and connections

Number

gFiler HBA ports used

4 (2 each node)

Storage subsystem ports used

8 (4 each CL)

Switch ports used

6

Total cable connections

10, including cluster interconnect cables

Notes to the illustration:

Port-to-port connectivity  Top

The following table summarizes the port-to-port connectivity scheme for this configuration example for between 257 and 512 LUNs.

Port-to-port connectivity scheme

gFiler 1

Switch

1A

Any port on switch 1

2B

Any port on switch 2

gFiler 2

Switch

1A

Any port on switch 1

2B

Any port on switch 2

Storage subsystem

Switch

CL1-B

Any port on switch 1

CL2-B

Any port on switch 2

CL1-A

Any port on switch 1

CL2-A

Any port on switch 2

Library Table of Contents Index Previous Page (Alt-p) Next Page (Alt-n) Comments