Direct-attached cluster configuration

About this section  Top

This section describes how to configure the following platforms in a direct-attached cluster configuration:

Connections required  Top

The following table describes the number of ports and cable connections required for a direct-attached cluster configuration.

Gateway model

Gateway HBA ports used

Storage subsystem ports used

Number of
total cable connections

LUNs supported

GF270c

2

2

4

42

GF825c

4

4

4

168

GF920c

4

4

4

336

GF940c

4

4

4

672

GF960c

4

4

4

672

Connectivity diagram  Top

The following diagram shows how your gateway connects to your storage subsystem.

Port-to-port connectivity  Top

The following port-to-port scheme supports the maximum number of LUNs on each port in a redundant configuration.

Port-to-port connectivity scheme

Gateway 1

Storage subsystem

1A

1A

2B

2A

Gateway 2

Storage subsystem

1A

1B

2B

2B