You need to cable the switches at the partner site so that they can work with the local switches.
To cable the partner site switches, complete the following steps.
| 1 |
Log in to Switch 3 and set it up as described in Stage 2: Configuring the local switches. |
| 2 |
To cable the remote node, disk shelves, and switch, complete the following steps, using the applicable diagram for reference.
| 1 |
Cable the first Fibre Channel HBA in slot 5 of the remote node to Switch 3 and Switch 4. In the example, the top port of the Fibre Channel HBA is cabled to Port 8 of Switch 3 and the bottom port is cabled to Port 8 of Switch 4. |
|
| 2 |
Cable the second Fibre Channel HBA in slot 8 of the remote node to Switch 3 and Switch 4. In the example, the top port of the Fibre Channel HBA is cabled to Port 9 of Switch 3 and the bottom port is cabled to Port 9 of Switch 4. |
|
| 3 |
Connect the local node pool 0 disks to the switches by completing the following substeps:
In the example, the pool 0 disk shelves are connected to switch port 0 on both Switch 3 and 4. However, you can use any open set of switch ports in this quadrant (limited to ports 0-3 in this configuration). |
|
| 4 |
Connect the remote node pool 1 disks to the switches by completing the following substeps:
In the example, the pool 1 disk shelves are connected to switch port 12 on both Switch 3 and 4. However, you can use any open set of switch ports in this quadrant (limited to ports 12-15 in this configuration). |
|
| 5 |
Confirm that the disks are visible and have dual paths by entering the following command on the console: storage show disk -p ResultsThe output shows the disks connected to the switches, to what port they are connected, and to what disk and to which LRC, ESH, or ESH2 they belong, as shown in the following example: Exampleha16*> storage show disk -p PRIMARY PORT SECONDARY PORT SHELF BAY switch3:0.40 A switch4:0.40 B 5 0 |
|
| 6 |
Connect the ISL from Switch 1 to Switch 3 and connect the ISL from Switch 2 to Switch 4. |
|
| 7 |
Connect the VI-MC cluster adapter to the switches, with the top port connecting to Switch 3 and the bottom port connecting to Switch 4. Note |
|
| 8 | ||
| 9 |
Check to make sure that the node can see all disk shelves by entering the following command on the console: aggr status -r |
|
| 10 |
Configure the cluster, as described in Chapter 4, Configuring a Cluster. |
|
Copyright © 1994-2005, Network Appliance, Inc. All rights
reserved.