When you schedule a report for processing through the Scheduler interface, you need to create a schedule task and then assign a frequency of processing to that task.
Follow these steps to create a schedule.
| 1 | In the Scheduler/Event page, click on the New button. ResultThe Scheduler/Event Properties window is displayed with the Details tab shown |
|
| 2 | ||
| 3 | ||
| 4 | In the Definitions drop-down box, select the Report Definition you want processed. Note |
|
|
5
|
||
Click on the Execute this task drop-down box and select one time only. In the Start-time and Start-date boxes, select the time and date when you want the report to be processed. Go to Step 6 |
||
Click on the Execute this task drop-down box and select every N minutes. In the Start-time and Start-date boxes, select the time and date when you want the report to be processed. In the End-date drop-down box, select the date you want the scheduled processing to end. Leave the Ignore box checked (the default setting), and ContentReporter will automatically run this Scheduled Event at the scheduled intervals. Complete this step by making selections in the Interval and Run every drop-down boxes. Go to Step 6 |
||
Click on the Execute this task drop-down box and select every N minutes. In the Start-time and Start-date boxes, select the time and date when you want the report to be processed. In the End-date drop-down box, select the date you want the scheduled processing to end. Leave the Ignore box checked (the default setting), and ContentReporter will automatically run this Scheduled Event at the scheduled intervals. Complete this step by making selections in the Interval and Run every drop-down boxes. Go to Step 6 |
||
Click on the Execute this task drop-down box and select every N minutes. In the Start-time and Start-date boxes, select the time and date when you want the report to be processed. In the End-date drop-down box, select the date you want the scheduled processing to end. Leave the Ignore box checked (the default setting), and ContentReporter will automatically run this Scheduled Event at the scheduled intervals. Complete this step by making selections in the Interval drop-down boxes. Go to Step 6 |
||
Click on the Execute this task drop-down box and select weekly. In the Start-time and Start-date boxes, select the time and date when you want the report to be processed. In the End-date drop-down box, select the date you want the scheduled processing to end. Leave the Ignore box checked (the default setting), and ContentReporter will automatically run this Scheduled Event at the scheduled intervals. Complete this step by making selections in the Day(s) selection boxe(s.) Go to Step 6 |
||
|
MONTHLY |
Click on the Execute this task drop-down box and select weekly. In the Start-time and Start-date boxes, select the time and date when you want the report to be processed. In the End-date drop-down box, select the date you want the scheduled processing to end. Leave the Ignore box checked (the default setting), and ContentReporter will automatically run this Scheduled Event at the scheduled intervals. Complete this step by making selections in the Interval and Month(s) selection boxe(s.) Go to Step 6 |
|
| 6 |
ResultThe report is scheduled for processing. The Task name and its pertinent information is listed on the Scheduler/Event tab. If the schedule is not properly configured, the missing information dialog box displays. |
|
If you have not completed the schedule information correctly, a dialog displays listing the missing information.
Once you have created a schedule to process a report, you can run it immediately by selecting the Schedule and pressing the run button.
The following table describes the possible states, statuses, and conditions of scheduled events.
Copyright © 1994-2001, Network Appliance, Inc. All rights
reserved.
Part No. 210-00067
File: cr30rg10.htm
Last updated: 12/07/01 18:12:46