You can create or schedule a SnapManager backup in two ways:
For details, see Backing up using the SnapManager Backup Wizard.
For details, see Backing up using the Backup tab.
You need to provide the following information to perform a SnapManager backup:
For details, see How backup management groups are used.
For details, see Understanding the backup naming conventions.
For details, see Deleting backups automatically.
For details, see Option to retain up-to-the-minute restore ability.
Although it is possible to restore from an unverified backup, NetApp strongly recommends that you restore only from verified backups.
For details, see Using Run Command After Operation to archive automatically.
To back up the Exchange databases using the SnapManager Backup Wizard, complete the following steps.
| 1 |
In the SnapManager for Microsoft Exchange main window, click the SnapManager Backup Wizard icon. ResultThe SnapManager for Microsoft Exchange Backup Wizard Welcome Window appears. |
|
| 2 |
Follow the instructions in the Backup Wizard to initiate your backup. For a list of information you need to provide as you complete this step, see Information you need to perform a backup. |
|
| 3 |
At the Completing the Backup Wizard dialog box, click Finish after you verify that all the settings in the window are true. ResultThe Backup Status window appears. |
|
| 4 |
In the Backup Status Window, click Start Now to start the backup. ResultThe backup is performed and the snapshot is written to the volume. SnapManager Backup completes each task and checks it off on the list shown in the Backup Task List view. You can switch back and forth between the task check-off list and the progress report using the Switch buttons on either window. If the backup is successful, the Task window shows the check-off list with the tasks completed. Note |
|
To back up your Exchange data store using the Backup tab, complete the following steps.
Note
The window shown in this procedure is for the Exchange 2000 or 2003 version of SnapManager. If you are using Exchange 5.5, some of the text you see is slightly different. However, the actions you take to perform these steps are the same.
| 1 |
In the SnapManager interface, select the Backup and Verification tab. |
|
| 2 |
In the Backup window, select the storage groups (Stores) you want to back up.
|
|
| 3 |
In the Backup Management Group field, select the management group for the backup you want to create. For more information about backup management groups, see How backup management groups are used. |
|
| 4 |
If you want to delete older backups of this backup management group automatically, select the Delete Oldest Backups In Excess Of check box and select the number of backups of this backup management group you want to keep. For more information about automatic backup deletion, see Deleting backups automatically. Note |
|
| 5 | ||
|
You want to verify the backup immediately after the backup is complete |
Select the Verify Backed Up Databases and Transaction Logs check box. | |
|
Do not select the Verify Backed Up Databases and Transaction Logs check box. | ||
|
Note |
||
| 6 |
If you want to run a command after the backup is complete, select the Run Command After Operation check box. This is usually done to archive backups. For details, see Using Run Command After Operation to archive automatically. |
|
| 7 |
If your volume is a SnapMirror source volume and you do not want the destination volume to be updated after this backup is complete, clear the Update SnapMirror After Operation check box. |
|
| 8 | ||
|
Click Backup Now and proceed to Step 12. ResultThe Backup Status window appears, showing the Task list. | ||
|
Click Schedule to use the Windows Task Manager to schedule your backup and proceed to the next step. | ||
| 9 |
In the Schedule Jobs window, name your backup job, provide the user ID and password for the job, then click OK. Note ResultThe Schedule Job window is displayed. |
|
| 10 |
In the Schedule Job window, use the Schedule tab to specify the parameters of your job schedule: |
|
| 11 |
After you schedule your job, click OK. ResultThe backup job runs at the times you specified in the Schedule Task window. The backup process is complete. Note |
|
| 12 |
In the Backup Status window, click Start Now to back up the selected storage groups. ResultThe backup is performed and the snapshot is written to the volume. SnapManager Backup completes each task and checks it off on the list shown in the Backup Task List view. You can switch back and forth between the task check-off list and the progress report using the Switch buttons on either window. If the backup is successful, the Task window shows the check-off list with the tasks completed. Note |
|
Copyright © 1994-2004, Network Appliance, Inc. All rights
reserved.
Part No. 215-00858
File: backup5.htm
Last updated: Tue Jun 15 15:34:09 2004